PLUMTREE
SubstationNew York · CONNECTICUT LIGHT & POWER CO
PLUMTREE is an electric transmission substation in New York, operated by CONNECTICUT LIGHT & POWER CO. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #20458 | 345 kV | CONNECTICUT LIGHT & POWER CO | IN SERVICE | 17.8 mi |
| #10617 | 115 kV | — | IN SERVICE | 3.4 mi |
| #11093 | 115 kV | — | IN SERVICE | 6.0 mi |
| #11095 | 115 kV | — | IN SERVICE | 0.8 mi |
| #11096 | 115 kV | — | IN SERVICE | 1.8 mi |
| #48738 | 115 kV | — | IN SERVICE | 1.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PLUMTREE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PLEASANT VALLEY | Substation-Adjacent | NY | Dutchess County | 345 kV | 600 MW | 3.5 yrs | 70.7 |
| FROST BRIDGE | Substation-Adjacent | CT | Naugatuck Valley Planning Region | 345 kV | 600 MW | 3.5 yrs | 70.0 |
| BRIDGEPORT RESCO | Substation-Adjacent | CT | Greater Bridgeport Planning Region | 345 kV | 600 MW | 3.5 yrs | 69.7 |
| TAP140045 | Substation-Adjacent | NY | Westchester County | 115 kV | 100 MW | 3.5 yrs | 67.4 |
| SOUTH END | Substation-Adjacent | NY | Westchester County | 115 kV | 100 MW | 3.5 yrs | 67.4 |
| PLUMTREE | Substation-Adjacent | CT | Western Connecticut Planning Region | 345 kV | 600 MW | 3.5 yrs | 67.0 |
| LONG MOUNTAIN | Substation-Adjacent | NY | Dutchess County | 345 kV | 600 MW | 3.5 yrs | 66.9 |
| BRIDGEPORT HARBOR | Substation-Adjacent | CT | Greater Bridgeport Planning Region | 345 kV | 600 MW | 3.5 yrs | 66.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.