PALMER

Substation

New York · FITCHBURG GAS AND ELECTRIC LIGHT COMPANY

Max voltage
115
kV

PALMER is an electric transmission substation in New York, operated by FITCHBURG GAS AND ELECTRIC LIGHT COMPANY. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorFITCHBURG GAS AND ELECTRIC LIGHT COMPANY
Co-ownerWESTERN MASSACHUSETTS ELECTRIC COMPANY
Coordinates42.1956, -72.2638

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#29621115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE6.5 mi
#39272115 kVWESTERN MASSACHUSETTS ELECTRIC COMPANYIN SERVICE10.4 mi
#40473115 kVIN SERVICE6.1 mi
#48997115 kVIN SERVICE10.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PALMER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PALMER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STONY BROOKSubstation-AdjacentMAHampden County345 kV600 MW3.5 yrs72.4
Stony BrookBrownfieldMAHampden422 MW70.4
LAKE ROADSubstation-AdjacentCTNortheastern Connecticut Planning Region345 kV600 MW3.5 yrs68.2
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs67.6
LUDLOWSubstation-AdjacentMAHampden County345 kV600 MW3.5 yrs65.6
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs65.2
AMHERSTSubstation-AdjacentMAFranklin County345 kV600 MW3.5 yrs64.8
Riverside HolyokeBrownfieldMAHampden1 MW64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PALMER substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.