NEW HAVEN HARBOR

Substation

New York · CONNECTICUT LIGHT & POWER CO

Max voltage
345
kV

NEW HAVEN HARBOR is an electric transmission substation in New York, operated by CONNECTICUT LIGHT & POWER CO. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorCONNECTICUT LIGHT & POWER CO
Coordinates41.2867, -72.9045

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18994345 kVIN SERVICE0.2 mi
#49176345 kVCONNECTICUT LIGHT & POWER COIN SERVICE32.7 mi
#3217115 kV0.1 mi
#39340115 kVIN SERVICE2.9 mi
#41111115 kVIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEW HAVEN HARBOR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEW HAVEN HARBOR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NO. WALLSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.5 yrs70.0
FROST BRIDGESubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.5 yrs70.0
BRIDGEPORT RESCOSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW3.5 yrs69.7
UNKNOWN133278Substation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.5 yrs69.4
BRIDGEPORT HARBORSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW3.5 yrs66.8
FREIGHTSubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW3.5 yrs65.7
NOERASubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW3.5 yrs65.7
MILFORD POWERSubstation-AdjacentCTGreater Bridgeport Planning Region115 kV100 MW3.5 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NEW HAVEN HARBOR substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.