MOSHIER

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

MOSHIER is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates43.8958, -75.1917

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32519115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE7.0 mi
#64445115 kVNIAGARA MOHAWK POWER CORP.0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOSHIER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOSHIER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN125628Substation-AdjacentNYLewis County230 kV300 MW3.5 yrs65.8
Greenfield (MASSENA - MARCY)GreenfieldNYLewis County765 kV1,000 MW3.5 yrs64.4
Greenfield (MASSENA - MARCY)GreenfieldNYOneida County765 kV1,000 MW3.5 yrs64.0
Greenfield (MASSENA - MARCY)GreenfieldNYSt. Lawrence County765 kV1,000 MW3.5 yrs63.7
Greenfield (MASSENA - MARCY)GreenfieldNYLewis County765 kV1,000 MW3.5 yrs63.7
CHASES LAKESubstation-AdjacentNYLewis County230 kV300 MW3.5 yrs63.3
Greenfield (MASSENA - MARCY)GreenfieldNYLewis County765 kV1,000 MW3.5 yrs62.9
ADIRONDACKSubstation-AdjacentNYLewis County230 kV300 MW3.5 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen