MONTAGUE/CABOT
SubstationNew York · GREEN MOUNTAIN POWER CORP
MONTAGUE/CABOT is an electric transmission substation in New York, operated by GREEN MOUNTAIN POWER CORP. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #23868 | 115 kV | — | IN SERVICE | 14.9 mi |
| #27997 | 115 kV | — | IN SERVICE | 17.5 mi |
| #29739 | 115 kV | — | — | 0.1 mi |
| #46655 | 115 kV | WESTERN MASSACHUSETTS ELEC CO | IN SERVICE | 2.8 mi |
| #47959 | 115 kV | GREEN MOUNTAIN POWER CORP | IN SERVICE | 25.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MONTAGUE/CABOT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| STONY BROOK | Substation-Adjacent | MA | Hampden County | 345 kV | 600 MW | 3.5 yrs | 72.4 |
| Stony Brook | Brownfield | MA | Hampden | — | 422 MW | — | 70.4 |
| AMHERST | Substation-Adjacent | MA | Franklin County | 345 kV | 600 MW | 3.5 yrs | 64.8 |
| Riverside Holyoke | Brownfield | MA | Hampden | — | 1 MW | — | 64.3 |
| MOUNT TOM | Substation-Adjacent | MA | Hampshire County | 115 kV | 100 MW | 3.5 yrs | 63.4 |
| ORCHARD | Substation-Adjacent | MA | Hampden County | 115 kV | 100 MW | 3.5 yrs | 63.1 |
| VERMONT YANKEE | Substation-Adjacent | MA | Franklin County | 345 kV | 600 MW | 3.5 yrs | 62.9 |
| UNKNOWN133478 | Substation-Adjacent | MA | Hampshire County | 115 kV | 100 MW | 3.5 yrs | 62.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MONTAGUE/CABOT substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.