HADDAM NECK

Substation

New York · CONNECTICUT LIGHT & POWER CO

Max voltage
345
kV

HADDAM NECK is an electric transmission substation in New York, operated by CONNECTICUT LIGHT & POWER CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorCONNECTICUT LIGHT & POWER CO
Coordinates41.4956, -72.5184

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#23471345 kVCONNECTICUT LIGHT & POWER COIN SERVICE5.2 mi
#25955345 kVCONNECTICUT LIGHT & POWER COIN SERVICE22.7 mi
#49852345 kVCONNECTICUT LIGHT & POWER COIN SERVICE18.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HADDAM NECK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HADDAM NECK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NO. WALLSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.5 yrs70.0
UNKNOWN133278Substation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.5 yrs69.4
MANCHESTERSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs69.1
MILLSTONESubstation-AdjacentCTSoutheastern Connecticut Planning Region345 kV600 MW3.5 yrs68.8
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs67.6
EAST HARTFORDSubstation-AdjacentCTCapitol Planning Region115 kV100 MW3.5 yrs65.7
CARD`Substation-AdjacentCTSoutheastern Connecticut Planning Region345 kV600 MW3.5 yrs65.3
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs65.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.