GLEN PARK HYDROELECTRIC PROJECT

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

GLEN PARK HYDROELECTRIC PROJECT is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates44.0008, -75.9619

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18982115 kVNIAGARA MOHAWK POWER CORP.0.0 mi
#25123115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GLEN PARK HYDROELECTRIC PROJECT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GLEN PARK HYDROELECTRIC PROJECT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN125576Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.7
REENERGY BLACK RIVERSubstation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.6
TAP139311Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.1
UNKNOWN125581Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.6
TAP139306Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.0
GLEN PARK HYDROELECTRIC PROJECTSubstation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.0
TAP139307Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs62.6
UNKNOWN125574Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs62.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.