CHURCHTOWN

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

CHURCHTOWN is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates42.1865, -73.7531

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10116115 kVIN SERVICE5.1 mi
#25946115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE5.4 mi
#29375115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CHURCHTOWN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CHURCHTOWN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEEDSSubstation-AdjacentNYGreene County345 kV600 MW3.5 yrs67.5
HURLEY AVENUESubstation-AdjacentNYUlster County345 kV600 MW3.5 yrs67.3
UNKNOWN129084Substation-AdjacentNYDutchess County345 kV600 MW3.5 yrs65.5
CASTLETON ENERGY CENTERSubstation-AdjacentNYAlbany County115 kV100 MW3.5 yrs64.8
Greenfield (PLEASANT VALLEY - LEEDS)GreenfieldNYDutchess County345 kV600 MW3.5 yrs63.9
UNKNOWN128944Substation-AdjacentNYColumbia County115 kV100 MW3.5 yrs63.9
TAP136127Substation-AdjacentNYColumbia County115 kV100 MW3.5 yrs63.8
GREENBUSHSubstation-AdjacentNYRensselaer County115 kV100 MW3.5 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CHURCHTOWN substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.