BULLS BRIDGE is an electric transmission substation in New York, operated by CONNECTICUT LIGHT & POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorCONNECTICUT LIGHT & POWER CO
Coordinates41.6204, -73.4422

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11042115 kVCONNECTICUT LIGHT & POWER COIN SERVICE4.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BULLS BRIDGE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BULLS BRIDGE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129085Substation-AdjacentNYPutnam County345 kV600 MW3.5 yrs71.5
PLEASANT VALLEYSubstation-AdjacentNYDutchess County345 kV600 MW3.5 yrs70.7
FROST BRIDGESubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.5 yrs70.0
WOOD STREETSubstation-AdjacentNYPutnam County345 kV600 MW3.5 yrs68.7
E. FISHKILLSubstation-AdjacentNYPutnam County345 kV600 MW3.5 yrs68.2
PLUMTREESubstation-AdjacentCTWestern Connecticut Planning Region345 kV600 MW3.5 yrs67.0
LONG MOUNTAINSubstation-AdjacentNYDutchess County345 kV600 MW3.5 yrs66.9
FREIGHTSubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW3.5 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BULLS BRIDGE substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.