TAP318063

Substation

New Mexico

Max voltage
115
kV

TAP318063 is an electric transmission substation in New Mexico. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.0909, -107.4532

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80143115 kVIN SERVICE6.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP318063, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP318063 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AMBROSIASubstation-AdjacentNMMcKinley County230 kV300 MW3.5 yrs61.4
TAP318063Substation-AdjacentNMCibola County115 kV100 MW3.5 yrs60.3
Greenfield (AMBROSIA - WEST MESA)GreenfieldNMCibola County230 kV300 MW3.5 yrs58.0
LOST HORIZON TAPSubstation-AdjacentNMBernalillo County115 kV100 MW3.5 yrs57.1
Greenfield (TAP318062 - LOST HORIZON TAP)GreenfieldNMCibola County115 kV100 MW3.5 yrs56.5
Greenfield (AMBROSIA - WEST MESA)GreenfieldNMMcKinley County230 kV300 MW3.5 yrs55.5
Greenfield (AMBROSIA - WEST MESA)GreenfieldNMBernalillo County230 kV300 MW3.5 yrs55.4
Greenfield (AMBROSIA - WEST MESA)GreenfieldNMCibola County230 kV300 MW3.5 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP318063 substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.