WINNEMUCCA

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
120
kV

WINNEMUCCA is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates40.9453, -117.7153

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81735120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE34.7 mi
#91192120 kVIN SERVICE51.2 mi
#91597120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE26.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINNEMUCCA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINNEMUCCA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WINNEMUCCASubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs58.3
DUN GLENNSubstation-AdjacentNVPershing County120 kV100 MW5.8 yrs57.0
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs56.5
WinnemuccaBrownfieldNVHumboldt County120 kV15 MW5.8 yrs56.5
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs54.8
Greenfield (VALMY - TRACY)GreenfieldNVPershing County345 kV600 MW5.8 yrs54.5
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs54.1
Greenfield (VALMY - TRACY)GreenfieldNVPershing County345 kV600 MW5.8 yrs54.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WINNEMUCCA substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.