WESTSIDE

Substation

Nevada · NEVADA POWER COMPANY

Max voltage
230
kV

WESTSIDE is an electric transmission substation in Nevada, operated by NEVADA POWER COMPANY. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorNEVADA POWER COMPANY
StateNevada
Coordinates36.1582, -115.2789

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82962230 kVNEVADA POWER COMPANYIN SERVICE1.1 mi
#90860230 kVNEVADA POWER COMPANYIN SERVICE4.6 mi
#84817138 kVNEVADA POWER COMPANYIN SERVICE2.0 mi
#88158138 kVNEVADA POWER COMPANYIN SERVICE4.4 mi
#90012138 kVNEVADA POWER COMPANYIN SERVICE3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WESTSIDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WESTSIDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLARKSubstation-AdjacentNVClark County230 kV300 MW5.8 yrs72.3
LENZIESubstation-AdjacentNVClark County500 kV1,000 MW5.8 yrs71.7
APEXSubstation-AdjacentNVClark County500 kV1,000 MW5.8 yrs71.0
ARDENSubstation-AdjacentNVClark County230 kV300 MW5.8 yrs70.9
GRAND TETONSubstation-AdjacentNVClark County230 kV300 MW5.8 yrs70.5
NEWPORTSubstation-AdjacentNVClark County230 kV300 MW5.8 yrs70.2
TOLSONSubstation-AdjacentNVClark County230 kV300 MW5.8 yrs70.2
DECATURSubstation-AdjacentNVClark County230 kV300 MW5.8 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.