WASHBURN
SubstationNevada · NEVADA POWER COMPANY
WASHBURN is an electric transmission substation in Nevada, operated by NEVADA POWER COMPANY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #81088 | 138 kV | NEVADA POWER COMPANY | IN SERVICE | 5.8 mi |
| #85073 | 138 kV | NEVADA POWER COMPANY | IN SERVICE | 1.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of WASHBURN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CLARK | Substation-Adjacent | NV | Clark County | 230 kV | 300 MW | 5.8 yrs | 72.3 |
| LENZIE | Substation-Adjacent | NV | Clark County | 500 kV | 1,000 MW | 5.8 yrs | 71.7 |
| APEX | Substation-Adjacent | NV | Clark County | 500 kV | 1,000 MW | 5.8 yrs | 71.0 |
| ARDEN | Substation-Adjacent | NV | Clark County | 230 kV | 300 MW | 5.8 yrs | 70.9 |
| CRYSTAL | Substation-Adjacent | NV | Clark County | 500 kV | 1,000 MW | 5.8 yrs | 70.8 |
| MCCULLOUGH | Substation-Adjacent | NV | Clark County | 500 kV | 1,000 MW | 5.7 yrs | 70.7 |
| GRAND TETON | Substation-Adjacent | NV | Clark County | 230 kV | 300 MW | 5.8 yrs | 70.5 |
| TOLSON | Substation-Adjacent | NV | Clark County | 230 kV | 300 MW | 5.8 yrs | 70.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for WASHBURN substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.