VENIDA

Substation

Nevada · AZUSA LIGHT & POWER

Max voltage
230
kV

VENIDA is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateNevada
Coordinates36.3255, -119.1344

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88572230 kVAZUSA LIGHT & POWERIN SERVICE8.4 mi
#89028230 kVIN SERVICE67.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of VENIDA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near VENIDA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RECTORSubstation-AdjacentCATulare County230 kV300 MW5.8 yrs60.7
VENIDASubstation-AdjacentCATulare County230 kV300 MW5.8 yrs60.0
PARLIERSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.0
WAHTOKESubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs57.8
SPRINGVILLESubstation-AdjacentCATulare County230 kV300 MW5.8 yrs56.5
REEDLEYSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs56.4
Greenfield (BIG CREEK 3 - VENIDA)GreenfieldCATulare County230 kV300 MW5.8 yrs54.8
Greenfield (BIG CREEK 3 - RECTOR)GreenfieldCAFresno County230 kV300 MW5.8 yrs54.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen