VEDDER
SubstationNevada · PACIFIC GAS & ELECTRIC COMPANY
VEDDER is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #86647 | 115 kV | PACIFIC GAS & ELECTRIC COMPANY | IN SERVICE | 2.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of VEDDER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MAGUNDEN | Substation-Adjacent | CA | Kern County | 230 kV | 300 MW | 5.8 yrs | 61.0 |
| SYCAMORE COGEN | Substation-Adjacent | CA | Kern County | 230 kV | 300 MW | 5.8 yrs | 60.8 |
| OMAR | Substation-Adjacent | CA | Kern County | 230 kV | 300 MW | 5.8 yrs | 60.0 |
| KERN | Substation-Adjacent | CA | Kern County | 230 kV | 300 MW | 5.8 yrs | 60.0 |
| Greenfield (VINCENT - MIDWAY) | Greenfield | CA | Kern County | 500 kV | 1,000 MW | 5.8 yrs | 58.3 |
| Greenfield (VINCENT - MIDWAY) | Greenfield | CA | Kern County | 500 kV | 1,000 MW | 5.8 yrs | 58.3 |
| BAKERSFIELD | Substation-Adjacent | CA | Kern County | 230 kV | 300 MW | 5.8 yrs | 58.2 |
| Greenfield (MIDWAY - VINCENT) | Greenfield | CA | Kern County | 500 kV | 1,000 MW | 5.8 yrs | 58.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for VEDDER substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.