TEMBLOR

Substation

Nevada · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

TEMBLOR is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates35.3828, -119.6962

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86618115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE14.3 mi
#87061115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.3 mi
#88191115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE57.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TEMBLOR, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TEMBLOR substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDWAYSubstation-AdjacentCAKern County500 kV1,000 MW5.8 yrs62.5
CALIENTESubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs59.0
SUNSETSubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs59.0
Greenfield (MIDWAY - DIABLO CANYON)GreenfieldCASan Luis Obispo County500 kV1,000 MW5.8 yrs58.8
ARCOSubstation-AdjacentCAKings County230 kV300 MW5.8 yrs58.7
SOLARSubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs58.3
Greenfield (VINCENT - MIDWAY)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.3
Greenfield (MIDWAY - DIABLO CANYON)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TEMBLOR substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.