TAP310748

Substation

Nevada · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

TAP310748 is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates35.3144, -118.9776

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84251115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE5.2 mi
#86194115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE7.0 mi
#88126115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE15.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310748, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310748 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MAGUNDENSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs61.0
SYCAMORE COGENSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.8
WHEELERSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.6
KERNSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.0
OMARSubstation-AdjacentCAKern County230 kV300 MW5.8 yrs60.0
WHEELER RIDGESubstation-AdjacentCAKern County230 kV300 MW5.8 yrs59.8
PASTORIASubstation-AdjacentCAKern County230 kV300 MW5.8 yrs59.7
Greenfield (MIDWAY - WHIRLWIND)GreenfieldCAKern County500 kV1,000 MW5.8 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.