T.S. POWER

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
120
kV

T.S. POWER is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates40.7480, -116.5298

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85758120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE5.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of T.S. POWER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near T.S. POWER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COYOTE CREEKSubstation-AdjacentNVElko County345 kV600 MW5.8 yrs60.4
T.S. POWERSubstation-AdjacentNVEureka County120 kV100 MW5.8 yrs57.7
MAGGIE CREEKSubstation-AdjacentNVElko County120 kV100 MW5.8 yrs57.3
QUARYSubstation-AdjacentNVElko County120 kV100 MW5.8 yrs57.0
Greenfield (ROBINSON - FALCON)GreenfieldNVEureka County345 kV600 MW5.8 yrs57.0
BARRICKSubstation-AdjacentNVElko County120 kV100 MW5.8 yrs56.4
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVElko County345 kV600 MW5.8 yrs56.3
TS Power PlantBrownfieldNVEureka168 MW56.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for T.S. POWER substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.