SPRINGVILLE
SubstationNevada
SPRINGVILLE is an electric transmission substation in Nevada. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #83073 | 230 kV | — | IN SERVICE | 51.8 mi |
| #83935 | 230 kV | — | IN SERVICE | 81.2 mi |
| #87725 | 230 kV | — | IN SERVICE | 51.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of SPRINGVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| RECTOR | Substation-Adjacent | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 60.7 |
| VENIDA | Substation-Adjacent | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 60.0 |
| VESTAL | Substation-Adjacent | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 57.4 |
| SPRINGVILLE | Substation-Adjacent | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 56.5 |
| Greenfield (BIG CREEK 3 - VENIDA) | Greenfield | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 54.8 |
| Greenfield (BIG CREEK 3 - VENIDA) | Greenfield | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 54.2 |
| Greenfield (MAGUNDEN - SPRINGVILLE) | Greenfield | CA | Kern County | 230 kV | 300 MW | 5.8 yrs | 54.1 |
| Greenfield (MAGUNDEN - SPRINGVILLE) | Greenfield | CA | Tulare County | 230 kV | 300 MW | 5.8 yrs | 53.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SPRINGVILLE substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.