SEARLES

Substation

Nevada · AZUSA LIGHT & POWER

Max voltage
115
kV

SEARLES is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateNevada
Coordinates35.7000, -117.3988

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83697115 kVAZUSA LIGHT & POWERIN SERVICE5.1 mi
#85335115 kVAZUSA LIGHT & POWERIN SERVICE18.7 mi
#92731115 kVAZUSA LIGHT & POWERIN SERVICE28.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SEARLES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SEARLES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DOWNSSubstation-AdjacentCAKern County115 kV100 MW5.8 yrs55.7
SEARLESSubstation-AdjacentCAInyo County115 kV100 MW5.8 yrs54.8
MCGENSubstation-AdjacentCAInyo County115 kV100 MW5.8 yrs54.2
INYOKERNSubstation-AdjacentCAKern County120 kV100 MW5.8 yrs53.8
COSO 4-6Substation-AdjacentCAInyo County115 kV100 MW5.8 yrs53.1
Greenfield (COSO 7 - KRAMER)GreenfieldCAKern County230 kV300 MW5.8 yrs53.0
COSO ENERGY DEVELOPERSSubstation-AdjacentCAInyo County115 kV100 MW5.8 yrs51.7
Greenfield (DOWNS - SEARLES)GreenfieldCAInyo County115 kV100 MW5.8 yrs51.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.