RUSH CREEK
SubstationNevada · AZUSA LIGHT & POWER
RUSH CREEK is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #84235 | 115 kV | AZUSA LIGHT & POWER | IN SERVICE | 15.2 mi |
| #87903 | 115 kV | AZUSA LIGHT & POWER | IN SERVICE | 19.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of RUSH CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Greenfield (CELILO - SYLMAR EAST) | Greenfield | CA | Mono County | 1000 kV | 1,000 MW | 5.8 yrs | 54.9 |
| RUSH CREEK | Substation-Adjacent | CA | Mono County | 115 kV | 100 MW | 5.8 yrs | 54.6 |
| LEE VINING | Substation-Adjacent | CA | Mono County | 115 kV | 100 MW | 5.8 yrs | 53.8 |
| Greenfield (CELILO - SYLMAR EAST) | Greenfield | CA | Mono County | 1000 kV | 1,000 MW | 5.8 yrs | 51.6 |
| CASA DIABLO | Substation-Adjacent | CA | Mono County | 115 kV | 100 MW | 5.8 yrs | 51.5 |
| CAMINO | Substation-Adjacent | CA | Mono County | 230 kV | 300 MW | 5.7 yrs | 51.1 |
| KINGS RIVER | Substation-Adjacent | CA | Mono County | 230 kV | 300 MW | 5.8 yrs | 50.6 |
| POOLE PH | Substation-Adjacent | CA | Mono County | 115 kV | 100 MW | 5.8 yrs | 50.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.