ROBINSON

Substation

Nevada · MT. WHEELER POWER

Max voltage
500
kV

ROBINSON is an electric transmission substation in Nevada, operated by MT. WHEELER POWER. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage345 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorMT. WHEELER POWER
StateNevada
Coordinates39.2802, -114.9739

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#90112500 kVIN SERVICE202.8 mi
#88073345 kVMT. WHEELER POWERIN SERVICE10.6 mi
#91948345 kVIN SERVICE174.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROBINSON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROBINSON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROBINSONSubstation-AdjacentNVWhite Pine County500 kV1,000 MW5.8 yrs61.2
GONDERSubstation-AdjacentNVWhite Pine County345 kV600 MW5.8 yrs59.1
Ely Energy CenterBrownfieldNVWhite Pine County345 kV1,500 MW5.8 yrs56.9
Greenfield (TAP307893 - ROBINSON)GreenfieldNVWhite Pine County500 kV1,000 MW5.8 yrs55.9
Greenfield (TAP307893 - ROBINSON)GreenfieldNVWhite Pine County500 kV1,000 MW5.8 yrs54.7
Greenfield (ROBINSON - FALCON)GreenfieldNVWhite Pine County345 kV600 MW5.8 yrs54.3
Greenfield (ROBINSON - FALCON)GreenfieldNVWhite Pine County345 kV600 MW5.8 yrs53.8
Greenfield (TAP307893 - ROBINSON)GreenfieldNVWhite Pine County500 kV1,000 MW5.8 yrs53.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROBINSON substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.