PISGAH
SubstationNevada · AZUSA LIGHT & POWER
PISGAH is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #83823 | 230 kV | AZUSA LIGHT & POWER | IN SERVICE | 60.0 mi |
| #86625 | 230 kV | — | IN SERVICE | 108.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PISGAH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Greenfield (INTERMOUNTAIN - ADELANTO) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.7 yrs | 59.4 |
| Greenfield (MOHAVE - LUGO) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.7 yrs | 58.4 |
| Greenfield (MOHAVE - LUGO) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.7 yrs | 58.2 |
| Greenfield (ELDORADO - LUGO) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.8 yrs | 58.0 |
| PISGAH | Substation-Adjacent | CA | San Bernardino County | 230 kV | 300 MW | 5.8 yrs | 57.9 |
| Greenfield (MOHAVE - LUGO) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.7 yrs | 57.9 |
| Greenfield (ADELANTO - MCCULLOUGH) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.8 yrs | 57.9 |
| Greenfield (ELDORADO - LUGO) | Greenfield | CA | San Bernardino County | 500 kV | 1,000 MW | 5.8 yrs | 57.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PISGAH substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.