OSCEOLA
SubstationNevada · MT. WHEELER POWER
OSCEOLA is an electric transmission substation in Nevada, operated by MT. WHEELER POWER. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #89382 | 230 kV | — | IN SERVICE | 100.8 mi |
| #91480 | 230 kV | MT. WHEELER POWER | IN SERVICE | 27.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of OSCEOLA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| GONDER | Substation-Adjacent | NV | White Pine County | 345 kV | 600 MW | 5.8 yrs | 59.1 |
| OSCEOLA | Substation-Adjacent | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 56.8 |
| Greenfield (INTERMOUNTAIN - GONDER) | Greenfield | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 53.2 |
| Greenfield (INTERMOUNTAIN - GONDER) | Greenfield | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 53.1 |
| Greenfield (OSCEOLA - GONDER) | Greenfield | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 52.4 |
| Greenfield (INTERMOUNTAIN - GONDER) | Greenfield | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 52.3 |
| Greenfield (UNKNOWN206223 - OSCEOLA) | Greenfield | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 52.0 |
| Greenfield (UNKNOWN206223 - OSCEOLA) | Greenfield | NV | White Pine County | 230 kV | 300 MW | 5.8 yrs | 51.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for OSCEOLA substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.