OROVADA

Substation

Nevada · HARNEY ELECTRIC COOPERATIVE

Max voltage
120
kV

OROVADA is an electric transmission substation in Nevada, operated by HARNEY ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorHARNEY ELECTRIC COOPERATIVE
StateNevada
Coordinates41.5850, -117.8489

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83027120 kVHARNEY ELECTRIC COOPERATIVEIN SERVICE7.5 mi
#87516120 kVHARNEY ELECTRIC COOPERATIVEIN SERVICE23.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OROVADA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OROVADA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN304552Substation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs57.8
OROVADASubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs55.5
Greenfield (UNKNOWN304552 - KINGS RIVER)GreenfieldNVHumboldt County115 kV100 MW5.8 yrs53.2
Greenfield (WINNEMUCCA - DAVEY TOWN)GreenfieldNVHumboldt County120 kV100 MW5.8 yrs52.6
EC FFE Humboldt CountyGreenfieldNVHumboldt County5.8 yrs52.2
Greenfield (UNKNOWN304552 - KINGS RIVER)GreenfieldNVHumboldt County115 kV100 MW5.8 yrs51.9
DAVEY TOWNSubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs51.5
Greenfield (UNKNOWN202789 - UNKNOWN304552)GreenfieldNVHumboldt County115 kV100 MW5.8 yrs51.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OROVADA substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.