OREANA

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
120
kV

OREANA is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates40.3359, -118.2742

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89979120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE58.3 mi
#90618120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE13.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OREANA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OREANA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs57.8
OREANASubstation-AdjacentNVPershing County120 kV100 MW5.8 yrs57.7
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs57.6
STAR PEAKSubstation-AdjacentNVPershing County120 kV100 MW5.8 yrs57.5
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs57.3
DUN GLENNSubstation-AdjacentNVPershing County120 kV100 MW5.8 yrs57.0
Greenfield (VALMY - TRACY)GreenfieldNVPershing County345 kV600 MW5.8 yrs56.8
Greenfield (TRACY - VALMY)GreenfieldNVPershing County345 kV600 MW5.8 yrs56.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OREANA substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.