OAKHURST

Substation

Nevada · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

OAKHURST is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates37.3219, -119.6343

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#89693115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE25.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OAKHURST, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OAKHURST substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BORDENSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs64.7
EASTWOODSubstation-AdjacentCAMadera County230 kV300 MW5.8 yrs60.3
Greenfield (HELM'S PUMPED STORAGE - GREGG)GreenfieldCAFresno County230 kV300 MW5.8 yrs57.9
Greenfield (HELM'S PUMPED STORAGE - GREGG)GreenfieldCAFresno County230 kV300 MW5.8 yrs57.7
BIG CREEK 2Substation-AdjacentCAMadera County230 kV300 MW5.8 yrs57.4
BIG CREEK 1Substation-AdjacentCAMadera County230 kV300 MW5.8 yrs57.2
WISHONSubstation-AdjacentCAMadera County115 kV100 MW5.8 yrs56.2
Greenfield (RECTOR - BIG CREEK 1)GreenfieldCAFresno County230 kV300 MW5.8 yrs56.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OAKHURST substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.