N. TRUCKEE
SubstationNevada
N. TRUCKEE is an electric transmission substation in Nevada. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #81606 | 115 kV | — | IN SERVICE | 19.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of N. TRUCKEE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| NORTH VALLEY ROAD | Substation-Adjacent | NV | Storey County | 345 kV | 600 MW | 5.8 yrs | 70.0 |
| BORDERTOWN | Substation-Adjacent | CA | Sierra County | 345 kV | 600 MW | 5.8 yrs | 65.4 |
| WASHOE | Substation-Adjacent | NV | Storey County | 120 kV | 100 MW | 5.8 yrs | 62.3 |
| MT. ROSE | Substation-Adjacent | NV | Storey County | 120 kV | 100 MW | 5.8 yrs | 62.0 |
| RENO | Substation-Adjacent | NV | Storey County | 120 kV | 100 MW | 5.8 yrs | 61.9 |
| NORTHWEST TAP | Substation-Adjacent | NV | Storey County | 120 kV | 100 MW | 5.8 yrs | 61.2 |
| EC Near Valley Road | Greenfield | NV | Washoe | — | — | 5.8 yrs | 59.4 |
| CALIFORNIA | Substation-Adjacent | NV | Storey County | 120 kV | 100 MW | 5.8 yrs | 59.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for N. TRUCKEE substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.