N.O. MILLERS

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
120
kV

N.O. MILLERS is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates38.1312, -117.4594

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83248120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE31.7 mi
#89863120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE12.6 mi
#92570120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE35.4 mi
#92871120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE15.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of N.O. MILLERS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near N.O. MILLERS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ANACONDASubstation-AdjacentNVEsmeralda County230 kV300 MW5.8 yrs56.8
N.O. MILLERSSubstation-AdjacentNVEsmeralda County120 kV100 MW5.8 yrs54.1
TONOPAHSubstation-AdjacentNVEsmeralda County120 kV100 MW5.8 yrs53.1
SILVER PEAKSubstation-AdjacentNVEsmeralda County120 kV100 MW5.8 yrs52.7
BLM Solar DLA: MillersGreenfieldNVEsmeralda County4,467 MW5.8 yrs51.4
Greenfield (UNKNOWN305563 - ANACONDA)GreenfieldNVEsmeralda County230 kV300 MW5.8 yrs51.4
Greenfield (UNKNOWN305563 - ANACONDA)GreenfieldNVEsmeralda County230 kV300 MW5.8 yrs50.9
ALKALISubstation-AdjacentNVEsmeralda County120 kV100 MW5.8 yrs50.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for N.O. MILLERS substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.