INYOKERN

Substation

Nevada · AZUSA LIGHT & POWER

Max voltage
120
kV

INYOKERN is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateNevada
Coordinates35.6526, -117.7958

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#91579120 kVIN SERVICE126.3 mi
#83768115 kVAZUSA LIGHT & POWERIN SERVICE48.5 mi
#91760115 kVAZUSA LIGHT & POWERIN SERVICE8.1 mi
#92731115 kVAZUSA LIGHT & POWERIN SERVICE28.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INYOKERN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INYOKERN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAKern County1000 kV1,000 MW5.8 yrs57.7
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAKern County1000 kV1,000 MW5.8 yrs56.8
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAKern County1000 kV1,000 MW5.8 yrs55.9
Greenfield (CELILO - SYLMAR EAST)GreenfieldCATulare County1000 kV1,000 MW5.8 yrs55.8
DOWNSSubstation-AdjacentCAKern County115 kV100 MW5.8 yrs55.7
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAKern County1000 kV1,000 MW5.8 yrs55.5
COSO 7Substation-AdjacentCAInyo County230 kV300 MW5.8 yrs55.3
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAInyo County1000 kV1,000 MW5.8 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for INYOKERN substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.