INYO is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateNevada
Coordinates37.3422, -118.4410

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87243230 kVIN SERVICE158.2 mi
#89149230 kVAZUSA LIGHT & POWERIN SERVICE9.5 mi
#83434115 kVAZUSA LIGHT & POWERIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INYO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INYO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVEsmeralda County1000 kV1,000 MW5.8 yrs59.1
INYOSubstation-AdjacentCAMono County230 kV300 MW5.8 yrs57.4
CONTROLSubstation-AdjacentCAMono County230 kV300 MW5.8 yrs57.3
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAInyo County1000 kV1,000 MW5.8 yrs57.1
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAMono County1000 kV1,000 MW5.8 yrs57.0
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVEsmeralda County1000 kV1,000 MW5.8 yrs56.0
SHERWINSubstation-AdjacentCAMono County115 kV100 MW5.8 yrs56.0
Greenfield (CELILO - SYLMAR EAST)GreenfieldCAMono County1000 kV1,000 MW5.8 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for INYO substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.