INDEPENDENCE is an electric transmission substation in Nevada. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

StateNevada
Coordinates41.4076, -115.9040

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#92639120 kVIN SERVICE14.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of INDEPENDENCE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near INDEPENDENCE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUMBOLDTSubstation-AdjacentNVElko County345 kV600 MW5.8 yrs65.0
Greenfield (MIDPOINT - HUMBOLDT)GreenfieldNVElko County345 kV600 MW5.8 yrs59.8
Greenfield (MIDPOINT - HUMBOLDT)GreenfieldNVElko County345 kV600 MW5.8 yrs59.0
Greenfield (HUMBOLDT - COYOTE CREEK)GreenfieldNVElko County345 kV600 MW5.8 yrs58.0
Greenfield (MIDPOINT - HUMBOLDT)GreenfieldNVElko County345 kV600 MW5.8 yrs57.4
Greenfield (HUMBOLDT - COYOTE CREEK)GreenfieldNVElko County345 kV600 MW5.8 yrs56.7
Greenfield (MIDPOINT - HUMBOLDT)GreenfieldNVElko County345 kV600 MW5.8 yrs56.5
INDEPENDENCESubstation-AdjacentNVElko County120 kV100 MW5.8 yrs53.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for INDEPENDENCE substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.