HELM'S PUMPED STORAGE

Substation

Nevada · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

HELM'S PUMPED STORAGE is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates37.0391, -118.9638

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83942230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE59.9 mi
#88781230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE59.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HELM'S PUMPED STORAGE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HELM'S PUMPED STORAGE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EASTWOODSubstation-AdjacentCAMadera County230 kV300 MW5.8 yrs60.3
PINE FLATSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs59.8
BIG CREEK 2Substation-AdjacentCAMadera County230 kV300 MW5.8 yrs57.4
BIG CREEK 1Substation-AdjacentCAMadera County230 kV300 MW5.8 yrs57.2
HELM'S PUMPED STORAGESubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs55.8
BALCHSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs55.8
MAMMOTHSubstation-AdjacentCAMadera County230 kV300 MW5.8 yrs55.8
HAASSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HELM'S PUMPED STORAGE substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.