GONDER

Substation

Nevada · MT. WHEELER POWER

Max voltage
345
kV

GONDER is an electric transmission substation in Nevada, operated by MT. WHEELER POWER. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorMT. WHEELER POWER
StateNevada
Coordinates39.3366, -114.8073

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88073345 kVMT. WHEELER POWERIN SERVICE10.6 mi
#88656230 kVMT. WHEELER POWERIN SERVICE66.6 mi
#90495230 kVIN SERVICE141.2 mi
#91480230 kVMT. WHEELER POWERIN SERVICE27.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GONDER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GONDER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROBINSONSubstation-AdjacentNVWhite Pine County500 kV1,000 MW5.8 yrs61.2
GONDERSubstation-AdjacentNVWhite Pine County345 kV600 MW5.8 yrs59.1
Ely Energy CenterBrownfieldNVWhite Pine County345 kV1,500 MW5.8 yrs56.9
OSCEOLASubstation-AdjacentNVWhite Pine County230 kV300 MW5.8 yrs56.8
Greenfield (TAP307893 - ROBINSON)GreenfieldNVWhite Pine County500 kV1,000 MW5.8 yrs55.9
Greenfield (TAP307893 - ROBINSON)GreenfieldNVWhite Pine County500 kV1,000 MW5.8 yrs54.7
Greenfield (ROBINSON - FALCON)GreenfieldNVWhite Pine County345 kV600 MW5.8 yrs54.3
Greenfield (TAP307893 - ROBINSON)GreenfieldNVWhite Pine County500 kV1,000 MW5.8 yrs53.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for GONDER substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.