GETCHEL

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
120
kV

GETCHEL is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates41.2152, -117.2457

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81474120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GETCHEL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GETCHEL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VALMYSubstation-AdjacentNVHumboldt County345 kV600 MW5.8 yrs63.8
LONE TREESubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs58.6
GETCHELSubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs58.5
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVHumboldt County345 kV600 MW5.8 yrs58.4
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVHumboldt County345 kV600 MW5.8 yrs57.8
Greenfield (VALMY - FALCON)GreenfieldNVLander County345 kV600 MW5.8 yrs57.5
RABBIT CREEKSubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs56.0
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVHumboldt County345 kV600 MW5.8 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen