FRONTIER
SubstationNevada · SIERRA PACIFIC POWER COMPANY
FRONTIER is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #83988 | 230 kV | — | IN SERVICE | 48.9 mi |
| #88283 | 230 kV | SIERRA PACIFIC POWER COMPANY | IN SERVICE | 57.1 mi |
| #88496 | 230 kV | SIERRA PACIFIC POWER COMPANY | IN SERVICE | 12.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of FRONTIER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| AUSTIN | Substation-Adjacent | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 59.3 |
| FRONTIER | Substation-Adjacent | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 54.5 |
| Greenfield (FRONTIER - UNKNOWN305563) | Greenfield | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 53.8 |
| Greenfield (FRONTIER - UNKNOWN305563) | Greenfield | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 52.2 |
| Greenfield (MACHACEK - FRONTIER) | Greenfield | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 51.4 |
| Greenfield (FRONTIER - UNKNOWN305563) | Greenfield | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 50.9 |
| Greenfield (FRONTIER - UNKNOWN305563) | Greenfield | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 50.5 |
| Greenfield (AUSTIN - FRONTIER) | Greenfield | NV | Lander County | 230 kV | 300 MW | 5.8 yrs | 49.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for FRONTIER substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.