FORT CHURCHILL

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
230
kV

FORT CHURCHILL is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as high-voltage (230 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage120 kV
Voltage classHigh-voltage (230 kV)
Connected lines7

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates39.1282, -119.1331

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#92073230 kVSIERRA PACIFIC POWER COMPANYIN SERVICE34.6 mi
#82252120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE40.0 mi
#82852120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE31.3 mi
#80894120 kVSIERRA PACIFIC POWER COMPANY0.1 mi
#85196120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE37.8 mi
#89094120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE37.8 mi
#84277120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE54.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FORT CHURCHILL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FORT CHURCHILL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs60.8
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs60.4
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs60.3
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs60.3
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs59.7
FORT CHURCHILLSubstation-AdjacentNVLyon County230 kV300 MW5.8 yrs59.3
EC Near TracyGreenfieldNVStorey5.8 yrs58.3
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FORT CHURCHILL substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.