FELLOWS

Substation

Nevada · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
115
kV

FELLOWS is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates35.1952, -119.5853

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85194115 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE4.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FELLOWS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FELLOWS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIDWAYSubstation-AdjacentCAKern County500 kV1,000 MW5.8 yrs62.5
SUNSETSubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs59.0
CALIENTESubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs59.0
Greenfield (MIDWAY - DIABLO CANYON)GreenfieldCASan Luis Obispo County500 kV1,000 MW5.8 yrs58.8
Greenfield (VINCENT - MIDWAY)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.3
Greenfield (VINCENT - MIDWAY)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.3
Greenfield (MIDWAY - DIABLO CANYON)GreenfieldCAKern County500 kV1,000 MW5.8 yrs58.0
Greenfield (MIDWAY - GATES)GreenfieldCAKings County500 kV1,000 MW5.8 yrs57.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.