EARLY INTAKE is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates37.8751, -119.9656

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82322230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE20.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EARLY INTAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EARLY INTAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEW MOCCASIN CRSubstation-AdjacentCATuolumne County230 kV300 MW5.8 yrs57.7
EARLY INTAKESubstation-AdjacentCATuolumne County230 kV300 MW5.8 yrs54.9
CURTISSubstation-AdjacentCATuolumne County115 kV100 MW5.7 yrs52.5
Sierra Pacific SonoraBrownfieldCATuolumne8 MW51.9
SPRING GAPSubstation-AdjacentCATuolumne County115 kV100 MW5.7 yrs50.3
Greenfield (WARNERVILLE - NEW MOCCASIN CR)GreenfieldCATuolumne County230 kV300 MW5.7 yrs50.1
Greenfield (NEW MOCCASIN CR - EARLY INTAKE)GreenfieldCATuolumne County230 kV300 MW5.8 yrs49.6
BEARDSLEY TAPSubstation-AdjacentCATuolumne County115 kV100 MW5.7 yrs49.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EARLY INTAKE substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.