DUN GLENN
SubstationNevada · SIERRA PACIFIC POWER COMPANY
DUN GLENN is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #88271 | 120 kV | SIERRA PACIFIC POWER COMPANY | IN SERVICE | 17.9 mi |
| #91597 | 120 kV | SIERRA PACIFIC POWER COMPANY | IN SERVICE | 26.2 mi |
| #91972 | 120 kV | SIERRA PACIFIC POWER COMPANY | IN SERVICE | 21.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of DUN GLENN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WINNEMUCCA | Substation-Adjacent | NV | Humboldt County | 120 kV | 100 MW | 5.8 yrs | 58.3 |
| OREANA | Substation-Adjacent | NV | Pershing County | 120 kV | 100 MW | 5.8 yrs | 57.7 |
| Greenfield (TRACY - VALMY) | Greenfield | NV | Pershing County | 345 kV | 600 MW | 5.8 yrs | 57.6 |
| BLUE MOUNTAIN | Substation-Adjacent | NV | Humboldt County | 120 kV | 100 MW | 5.8 yrs | 57.6 |
| STAR PEAK | Substation-Adjacent | NV | Pershing County | 120 kV | 100 MW | 5.8 yrs | 57.5 |
| DUN GLENN | Substation-Adjacent | NV | Pershing County | 120 kV | 100 MW | 5.8 yrs | 57.0 |
| Winnemucca | Brownfield | NV | Humboldt County | 120 kV | 15 MW | 5.8 yrs | 56.5 |
| Greenfield (TRACY - VALMY) | Greenfield | NV | Pershing County | 345 kV | 600 MW | 5.8 yrs | 56.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for DUN GLENN substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.