COYOTE CREEK

Substation

Nevada

Max voltage
345
kV

COYOTE CREEK is an electric transmission substation in Nevada. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage120 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateNevada
Coordinates41.0947, -116.4234

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81539345 kVIN SERVICE41.2 mi
#89966345 kVIN SERVICE28.6 mi
#84028120 kVIN SERVICE8.2 mi
#92455120 kVIN SERVICE11.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COYOTE CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COYOTE CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COYOTE CREEKSubstation-AdjacentNVElko County345 kV600 MW5.8 yrs60.4
Greenfield (HUMBOLDT - COYOTE CREEK)GreenfieldNVElko County345 kV600 MW5.8 yrs58.0
T.S. POWERSubstation-AdjacentNVEureka County120 kV100 MW5.8 yrs57.7
MAGGIE CREEKSubstation-AdjacentNVElko County120 kV100 MW5.8 yrs57.3
QUARYSubstation-AdjacentNVElko County120 kV100 MW5.8 yrs57.0
Greenfield (HUMBOLDT - COYOTE CREEK)GreenfieldNVElko County345 kV600 MW5.8 yrs56.7
BARRICKSubstation-AdjacentNVElko County120 kV100 MW5.8 yrs56.4
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVElko County345 kV600 MW5.8 yrs56.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for COYOTE CREEK substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.