CANDELARIA

Substation

Nevada · SIERRA PACIFIC POWER COMPANY

Max voltage
120
kV

CANDELARIA is an electric transmission substation in Nevada, operated by SIERRA PACIFIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorSIERRA PACIFIC POWER COMPANY
StateNevada
Coordinates38.2835, -118.0197

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82541120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE18.9 mi
#92570120 kVSIERRA PACIFIC POWER COMPANYIN SERVICE35.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CANDELARIA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CANDELARIA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN305535Substation-AdjacentNVMineral County120 kV100 MW5.8 yrs53.3
CANDELARIASubstation-AdjacentNVMineral County120 kV100 MW5.8 yrs51.0
Greenfield (UNKNOWN305535 - THORNE)GreenfieldNVMineral County120 kV100 MW5.8 yrs50.5
Greenfield (CANDELARIA - UNKNOWN305535)GreenfieldNVMineral County120 kV100 MW5.8 yrs50.1
Greenfield (N.O. MILLERS - CANDELARIA)GreenfieldNVMineral County120 kV100 MW5.8 yrs48.4
Greenfield (UNKNOWN305535 - THORNE)GreenfieldNVMineral County120 kV100 MW5.8 yrs47.7
Greenfield (N.O. MILLERS - CANDELARIA)GreenfieldNVMineral County120 kV100 MW5.8 yrs46.9
EC Near GabbsGreenfieldNVNye5.8 yrs46.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.