BIG CREEK 4

Substation

Nevada

Max voltage
230
kV

BIG CREEK 4 is an electric transmission substation in Nevada. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateNevada
Coordinates37.1389, -119.4887

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82270230 kVIN SERVICE5.7 mi
#83935230 kVIN SERVICE81.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIG CREEK 4, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIG CREEK 4 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Aquamarine Solar ProjectBrownfieldCAFresno250 MW65.0
PINEDALESubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs62.1
ASHLAN AVESubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs61.2
MANCHESTERSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs61.1
EASTWOODSubstation-AdjacentCAMadera County230 kV300 MW5.8 yrs60.3
BULLARDSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs60.0
PINE FLATSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs59.8
Greenfield (UNKNOWN301827 - HERNDON)GreenfieldCAFresno County230 kV300 MW5.8 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.