BIG CREEK 3

Substation

Nevada · AZUSA LIGHT & POWER

Max voltage
230
kV

BIG CREEK 3 is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines6

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateNevada
Coordinates37.1483, -119.3885

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81387230 kVIN SERVICE5.7 mi
#81497230 kVAZUSA LIGHT & POWERIN SERVICE5.8 mi
#82270230 kVIN SERVICE5.7 mi
#87245230 kVIN SERVICE6.6 mi
#87292230 kVIN SERVICE63.1 mi
#89028230 kVIN SERVICE67.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIG CREEK 3, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIG CREEK 3 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MANCHESTERSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs61.1
EASTWOODSubstation-AdjacentCAMadera County230 kV300 MW5.8 yrs60.3
BULLARDSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs60.0
PINE FLATSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs59.8
BARTONSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.7
TAP310561Substation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.5
WOODARDSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.5
LAS PALMASSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.