BIG CREEK 2

Substation

Nevada · AZUSA LIGHT & POWER

Max voltage
230
kV

BIG CREEK 2 is an electric transmission substation in Nevada, operated by AZUSA LIGHT & POWER. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorAZUSA LIGHT & POWER
StateNevada
Coordinates37.2002, -119.3069

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81497230 kVAZUSA LIGHT & POWERIN SERVICE5.8 mi
#86392230 kVAZUSA LIGHT & POWERIN SERVICE4.4 mi
#86788230 kVAZUSA LIGHT & POWERIN SERVICE1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIG CREEK 2, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIG CREEK 2 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EASTWOODSubstation-AdjacentCAMadera County230 kV300 MW5.8 yrs60.3
PINE FLATSubstation-AdjacentCAFresno County230 kV300 MW5.8 yrs59.8
TAP310561Substation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.5
CLOVISSubstation-AdjacentCAFresno County115 kV100 MW5.8 yrs58.0
Greenfield (HELM'S PUMPED STORAGE - GREGG)GreenfieldCAFresno County230 kV300 MW5.8 yrs57.9
Greenfield (HELM'S PUMPED STORAGE - GREGG)GreenfieldCAFresno County230 kV300 MW5.8 yrs57.7
BIG CREEK 2Substation-AdjacentCAMadera County230 kV300 MW5.8 yrs57.4
BIG CREEK 1Substation-AdjacentCAMadera County230 kV300 MW5.8 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BIG CREEK 2 substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.