ARCO

Substation

Nevada · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

ARCO is an electric transmission substation in Nevada, operated by PACIFIC GAS & ELECTRIC COMPANY. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPACIFIC GAS & ELECTRIC COMPANY
StateNevada
Coordinates35.7756, -119.9135

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85042230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE43.2 mi
#85382230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE35.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ARCO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ARCO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GATESSubstation-AdjacentCAKings County500 kV1,000 MW5.7 yrs61.8
CALIENTESubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs59.0
ARCOSubstation-AdjacentCAKings County230 kV300 MW5.8 yrs58.7
SOLARSubstation-AdjacentCASan Luis Obispo County230 kV300 MW5.8 yrs58.3
Greenfield (MIDWAY - GATES)GreenfieldCAKings County500 kV1,000 MW5.8 yrs58.3
UNKNOWN300573Substation-AdjacentCAKings County230 kV300 MW5.8 yrs57.9
Greenfield (MIDWAY - GATES)GreenfieldCAKings County500 kV1,000 MW5.8 yrs57.4
Greenfield (MIDWAY - LOS BANOS)GreenfieldCAKings County500 kV1,000 MW5.8 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ARCO substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.