ADELANTO

Substation

Nevada · LADWP

Max voltage
500
kV

ADELANTO is an electric transmission substation in Nevada, operated by LADWP. It is classified as extra-high-voltage (500 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines2

Ownership & operation

OperatorLADWP
StateNevada
Coordinates34.5514, -117.4378

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81821500 kVIN SERVICE169.8 mi
#90435500 kVLADWPIN SERVICE202.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ADELANTO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ADELANTO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
VICTORVILLESubstation-AdjacentCALos Angeles County500 kV1,000 MW5.8 yrs66.5
ADELANTOSubstation-AdjacentCALos Angeles County500 kV1,000 MW5.7 yrs62.9
LUGOSubstation-AdjacentCALos Angeles County500 kV1,000 MW5.7 yrs61.2
Greenfield (ADELANTO - MARKETPLACE)GreenfieldCASan Bernardino County500 kV1,000 MW5.8 yrs59.6
Greenfield (ADELANTO - MARKETPLACE)GreenfieldCASan Bernardino County500 kV1,000 MW5.8 yrs59.4
VICTORSubstation-AdjacentCALos Angeles County230 kV300 MW5.7 yrs59.1
Greenfield (ELDORADO - LUGO)GreenfieldCAOrange County500 kV1,000 MW5.8 yrs58.7
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldCALos Angeles County500 kV1,000 MW5.7 yrs58.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ADELANTO substation, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.