COLUMBUS WEST

Substation

Nebraska · LOUP RIVER PUBLIC POWER DIST

Max voltage
230
kV

COLUMBUS WEST is an electric transmission substation in Nebraska, operated by LOUP RIVER PUBLIC POWER DIST. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorLOUP RIVER PUBLIC POWER DIST
Coordinates41.1818, -97.8358

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1071230 kVIN SERVICE59.7 mi
#44794230 kVLOUP RIVER PUBLIC POWER DISTIN SERVICE4.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COLUMBUS WEST, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COLUMBUS WEST substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (UNKNOWN131727 - UNKNOWN131929)GreenfieldNEHamilton County345 kV600 MW3.5 yrs66.3
UNKNOWN131910Substation-AdjacentNEYork County115 kV100 MW3.5 yrs64.3
UNKNOWN131932Substation-AdjacentNEYork County115 kV100 MW3.5 yrs63.9
Greenfield (UNKNOWN131727 - UNKNOWN131929)GreenfieldNEHamilton County345 kV600 MW3.5 yrs63.7
UNKNOWN131875Substation-AdjacentNEPolk County115 kV100 MW3.5 yrs63.5
UNKNOWN131821Substation-AdjacentNEPlatte County115 kV100 MW3.5 yrs63.4
Greenfield (UNKNOWN131727 - UNKNOWN131929)GreenfieldNEHamilton County345 kV600 MW3.5 yrs63.3
York Landfill SolarBrownfieldNEYork63.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.