TAP154700

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
161
kV

TAP154700 is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates36.4422, -90.0769

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3480161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.1 mi
#24046161 kVUNION ELECTRIC CO - (MO)IN SERVICE29.3 mi
#44983161 kVUNION ELECTRIC CO - (MO)IN SERVICE2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154700, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154700 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP154705Substation-AdjacentMOButler County345 kV600 MW1.4 yrs70.3
WEST NEW MADRIDSubstation-AdjacentMONew Madrid County500 kV1,000 MW1.4 yrs70.1
TAP154742Substation-AdjacentMONew Madrid County345 kV600 MW1.4 yrs68.4
Greenfield (WEST NEW MADRID - DELL)GreenfieldTNLake County500 kV1,000 MW1.4 yrs65.7
UNKNOWN122826Substation-AdjacentMOButler County161 kV100 MW1.4 yrs65.2
UNKNOWN121102Substation-AdjacentMODunklin County161 kV100 MW1.4 yrs64.7
Greenfield (WEST NEW MADRID - DELL)GreenfieldMODunklin County500 kV1,000 MW1.4 yrs64.7
Greenfield (WEST NEW MADRID - DELL)GreenfieldMOPemiscot County500 kV1,000 MW1.4 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154700 substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.