TAP154681

Substation

Missouri · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

TAP154681 is an electric transmission substation in Missouri, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates36.0958, -89.2411

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15797161 kVIN SERVICE2.1 mi
#29118161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE6.7 mi
#38237161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE29.8 mi
#58772161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154681, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154681 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEAKLEYSubstation-AdjacentTNCrockett County500 kV1,000 MW1.4 yrs72.7
UNION CITYSubstation-AdjacentTNObion County161 kV100 MW3.7 yrs70.1
DYERSBURGSubstation-AdjacentTNDyer County161 kV100 MW3.7 yrs69.6
TAP154796Substation-AdjacentTNMadison County161 kV100 MW3.7 yrs69.5
TAP170492Substation-AdjacentTNMadison County161 kV100 MW3.7 yrs69.3
TAP160398Substation-AdjacentTNObion County161 kV100 MW3.7 yrs68.9
RIPLEYSubstation-AdjacentTNLauderdale County161 kV100 MW3.7 yrs68.7
TAP170493Substation-AdjacentTNMadison County161 kV100 MW3.7 yrs68.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.